Description: The work consists of the construction of an addition of (14) Classrooms and (2) Science Labs along with associated Workrooms, Offices and Restrooms to the original building which was completed in 2004. The original construction type was Type IB Construction (sprinklered) consisting of primarily load bearing construction. The new addition is Type IB Construction (sprinklered) consisting of structural steel frame (with sprayed fire protection) and masonry infill with brick veneer exterior. The roof system is SBS Modified Bitumen on lightweight insulated concrete roof deck along with gable type skylight units. The HVAC equipment is gas fired rooftop units with bipolar ionization. Also, including in the work are low voltage systems including fire alarm, intercom, surveillance and intrusion detection systems. Refer to specifications for further descriptions of finishes, doors, windows, power, lighting, and plumbing systems. Electronic bidding documents may be obtained at the office of the Architects, Manley Spangler Smith Architects, 525 East Taylor Street, Post Office Box 880, Griffin, Georgia 30224. Registration for documents, together with non-refundable deposit of $250.00 should be filed promptly with the Architects. A share file link for accessing PDF’s of bid documents will be emailed as soon as possible. Only bids received from Contractors registered with the Architect will be accepted. Bidding Documents may be examined at the following location(s) The Blue Book Building and Construction Network 800-431-2584 ext. 3180 Construct Connect c/o CMD Attn: DPC 800-364-2059 Dodge Data & Analytics 413-507-3179 National Association of Minority Contractors 470-355-1230 Manley Spangler Smith Architects 770-227-5473
Bid Protests Not Available