Provide labor, equipment, and materials for a complete installation of the HVAC/Electrical/ANAUL system for the above referenced project including: 1) Supply & install (1) new Type-1 exhaust hood for the stove/flattop. 2) Supply & install stainless steel backsplash for the hood. 3) Supply & install (1) up blast roof top exhaust fan including factory curb. 4) Supply & install grease duct from the hood to the fan. 5) Supply & install (1) rooftop make up air roof unit including duct distribution and factory curb. 6) Provide low voltage controls needed for the system. 7) Provide Air Balance including final reports and T-24. 8) Provide Crane & Rigging of the equipment. 9) Start-up, test, and put systems into operation. 10) Provide & install all electrical conduit/wire needed for the hood equipment. 11) Provide and install ANSUL fire suppression system for the new hood. 12) Repair and patch the existing roof area impacted by new roof top unit installation work.