The City of Roswell would like to beautify the Hardscrabble Green Loop corridor by installing landscaping throughout the corridor. The landscape plan calls for approximately 200 trees to be planted throughout the Hardscrabble Road corridor between King Road and Etris Road. The greatest concentration of plantings will occur between Chaffin Road (south of the new roundabout) and Hardscrabble Trail. Trees will be evenly spaced on the west side of the road, north and south of this area. Small clusters of smaller trees will be planted on the east side of the road. The landscape plan is consistent with the native plants in the area while taking the newly re-constructed Hardscrabble Road and utilities into consideration. Thirty (30) calendar days have been allotted for performance of project. A Bid Bond equal to 5% of the base bid will be required. 100% Payment and Performance bonds will also be required. Payment will be made no more than monthly, on a unit price / installed basis.