State Bid

Last Updated on 24 Mar 2022 at 4 AM
bid
Bakersfield California

Hageman Road Multi-Use Path Project

Solicitation ID CML-5109(271)
Posted Date 24 Mar 2022 at 4 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Bakersfield
Location Bakersfield California United states
Hageman Road Multi-Use Path Project consists of a new 0.40 mile long two directional 10 feet wide Class I bike path with 2’ wide shoulders on each side. The bike path will begin at the east side of Standard Street cul-de-sac and run east along the south side of the SR 99 and SR 204 connector up until the east side of the SR 99. The bike path continues east along the SR 204 off-ramp to Buck Owens Blvd and ends at Buck Owens Blvd. The bike path will have an all-weather paved surface allowing for two-way bicycle and pedestrian movement.
Bid Protests Not Available

Similar Past Bids