Hageman Road Multi-Use Path Project consists of a new 0.40 mile long two directional 10 feet wide Class I bike path with 2’ wide shoulders on each side. The bike path will begin at the east side of Standard Street cul-de-sac and run east along the south side of the SR 99 and SR 204 connector up until the east side of the SR 99. The bike path continues east along the SR 204 off-ramp to Buck Owens Blvd and ends at Buck Owens Blvd. The bike path will have an all-weather paved surface allowing for two-way bicycle and pedestrian movement.
Bid Protests Not Available