The purpose of this amendment is to provide a response to questions and remove Supplemental Insurance Requirement clause.
QUESTIONS/ANSWERS:
1.ÃÂ For the two steel USTs located at lot 6 North and South (50,000 gallons each)ÃÂ is the corrosion protection system galvanic or impressed current? Galvanic
2.ÃÂ For each UST:
ÃÂ ÃÂ ÃÂ ÃÂ ÃÂ a.ÃÂ How many containment sumps and transition sumps for each tank system?
Gainesville VA Medical Center Fuel Tanks 2021
Fuel Tank
Capacity
Location
Containment Sumps
Transition Sumps
Spill Buckets
North Tank
30000
Old Boiler Plant
1
1
1
South Tank
30000
Old Boiler Plant
1
0
1
Lot 6 North
50000
East of Parking Garage
1
1
2
Lot 6 South
50000
East of Parking Garage
1
1
2
CLC
2500
North of CLC
1
0
1
Bed Tower
6000
West of SW 16th st
0
0
0
Boiler Plant
40000
New Boiler Plant
3
8
1
b.ÃÂ Are any of the sumps deep buried (below 6 )? No
3.ÃÂ Does any of the diesel tanks contain biodiesel?ÃÂ If so, what percentage? Only #2 ULSD is used. No Biodiesel.
4.ÃÂ What is the manufacturer and model # of each ATG?
Gainesville VA Medical Center ATG for Fuel Tanks 2021
Fuel Tank
Capacity
Location
Make
Model
Serial
North Tank
30000
Old Boiler Plant Office
VeedeFboNotice
TLS-300C
C11122737305001
South Tank
30000
Lot 6 North
50000
Full Power Generator Room
VeedeFboNotice
Gilbarco
H03186014605001
Lot 6 South
50000
CLC
2500
CLC Generator Room
VeedeFboNotice
TLS-300C
E03156554905001
Bed Tower
6000
By Bed Tower AST
Omntec
OEL8000 2
ÃÂ
Boiler Plant
40000
New Boiler Plant
Pneumercator
TMS 3000
C11122737305001
5.ÃÂ Does the AST require an SP001 inspection? No. The inspection only has to meet all the AST inspection requirements of the FDEP.
6.ÃÂ When filtering the fuel, do you have a micron requirement? Primary Filters, ÃÂ One Micron.
7.ÃÂ Is there an oil/water separator on-site? Lot 6 UST s have a fuel oil cleaning system. The Contractor must use their own system. The Bed Tower AST has its own fuel oil cleaning system. The Contractor must use their own system.
8. Are there any site restrictions for access to the tanks for filtering the fuel? No.
ÃÂ
9. When was the last time the tanks were cleaned? ÃÂ Three of the tanks were cleaned last year. We sample every year and they were the only ones needing cleaning.
ÃÂ
10. Could you please tell me if the Combined Synopsis/Solicitation posted as solicitation number 36C24821Q0806 will be a follow-on requirement to any work performed currently or in the past, or will this be a new requirement? Is this a new requirement or an established program with an incumbent? New contract, previous contract expired.
11. Supplemental Insurance Requirement clause is hereby removed in entirety from solicitation 36C24821Q0647. ÃÂ
Bid Protests Not Available