VCS PACS and Security Additions | Fayetteville VAMC | Q&A: Q: Are Scaled Drawings available, if so please post. A: No Q: Are Ceilings Suspended? Or Hard Lid? A: Some are suspended, some are hard lid Q: Are there existing Cable Trays for wiring above ceilings? A: No Q: Can Existing Wiring be utilized? A: There isn t existing wiring for these additions Q: Is a UPS required? If so, What Time/Power Duration is required? A: This is an extension of an existing system current UPS will be utilized Q: Are Or Equal Equipment substitutions allowed? A: No these are extensions of our existing systems Q: Is Plenum Wire acceptable? A: System shall be in conduit but plenum cable can be used as long as it s installed in the conduit Q: Is After Hours Access for said work, available to contractor at no add l cost to the Gov t? A: Work shall be performed during normal duty hours, 7am-5pm. Q: What is the height of Exterior Cameras? (If any) A: There are no exterior cameras on this project Q: Please provide a list of equipment to be installed. A: It s not the VA s intent to provide a detailed equipment list. The selected contractor shall provide all necessary parts, components, material, installation, programming, and commissioning to meet the scope of work, as an extension to our existing system (PACS, IDS). Contractor shall submit a list of parts / materials they intend to use within their proposal and the VA will decide whether the parts / materials are equivalent to existing and / or meets the intent of the Scope.
Bid Protests Not Available