Point Of Contact Not Available
Project includes 1,471 SF removal of portions of present structure, 14,700 LF drilling hole, 3,675 LF drilled hole, 421 TN pre grouting, 2,205 EA grouting connection, 5,796 LF rapid cure silicone joint seal, 1,471 SF concrete (patching), 27 EA concre...
Bid Protests Not Available