In general, the work consists of demolition, including excavation and removal of existing landscape, to accommodate a groundwater recharge basin and installation of pump system that shall be connect to existing discharge pipe with bypass option. New controls shall be connected to the University¿s existing system in accordance with the plans and specifications.
Bid Protests Not Available