1)Contractors will sample IDW for disposal approval, securely drum up the IDW and place it for storage on-site at the direction of the COR
2)The purpose is to install groundwater monitoring wells in the water table. The depth to the water table is not known. Contractor shall perform 6 borings and well installations with an assumed value of 40-50 feet depth below each well.