***************************
07/29/2011 - This modification to original notice corrects the Place of Contract Performance Location/Address to read: "Mendocino National Forest, Grindstone Ranger District, 825 N. Humboldt Ave., Willows, CA 95988."
****************************
This Modification to original notice changes the primary and secondary contacts for this project. Primary contact is Marilyn Ladd at 530-226-2451; secondary contact is Anna Wargin at 530-841-4411.
****************************
The intent of this contract is to furnish all labor, equipment, materials, and supervision necessary for the reconditioning and armoring the invert of a 16 foot diameter sectional plate culvert pipe in Grindstone Creek on Forest Service Road 23N02. Major items of work include, but are not limited to: de-watering of the site, pressure grouting of existing voids below the culvert invert, placement of a reinforced concrete liner with steel ribs along the culvert bottom, placement of a reinforced concrete cut-of wall at the culvert outlet, reconstruction of eroded fill slopes, and placement of Class 7 riprap at the outlet.
PRICE RANGE: $100,000 - $$250,000
ESTIMTED START DATE: August 15, 2011 with 45 days of contract time.
REQUIRED RESPONSE: Solicitation will be a request for proposal requiring both price and technical proposal responding to the evaulation criteria as shown in the solicitation which will be posted on or about July 21, 2011
Bid Protests Not Available