Point Of Contact Not Available
The work covered in this contract shall include all labor, materials, equipment, abd services necessary for the removal and proper disposal of the existing 500,000 gallon steel water tower along with its associated equipment, buildings, utility enclosures, fences, and miscellaneous items as shown on the plans and specifications and as directed by the Engineer.
Bid Protests Not Available