State Bid

Last Updated on 11 Feb 2022 at 5 AM
SSA
Apple valley Minnesota

Greenleaf 6th & 7th Addition (Phase 1) Street Improvements

Solicitation ID Not Specified
Posted Date 11 Feb 2022 at 5 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Apple Valley Mn City Of
Location Apple valley Minnesota United states
SECTION 00 11 13 ADVERTISEMENT FOR BIDS Bids will be received electronically online only by the City of Apple Valley, Minnesota, through Quest CDN, until 2:00 P.M., CST, Tuesday, March 8th, 2022, at which time they will be reviewed for the furnishing of all labor, materials, and all else necessary for the following: City Project 2022-107 Greenleaf 6th & 7th Addition (Phase 1) Street Improvements 24 EA Clear and Grub tree, 12800 SY Remove Bituminous Pavement, 15975 LF Remove Curb and Gutter, 1050 CY Common Excavation, 8831 TN Select Granular Borrow, 6000 TN Cl 5 Aggregate Base, 2892 TN Bituminous Pavement, 7123 LF Concrete Curb and Gutter, 4088 SY Sod/Seed, 180 LF Remove storm pipe, 1120 LF Install storm pipe, With related items Digital copies of the Contract Documents can be obtained at www.questcdn.com. The Quest CDN project number is 8115596. Bidders can download the Contract documents for $20 by searching for the project on Quest CDN website’s Project Search page. Instructions for online bidding are attached. Please contact QuestCDN.com, prior to bidding, at (952) 233-1632 for assistance with free membership registration, downloading, and submitting bids. For electronic bids, electronic bid bonds will also be accepted through Surety 2000 using contract #8115596. The bid bonds must be payable to the City of Apple Valley in the amount of five percent (5%) of the amount of bid, to be forfeited as liquidated damages in the event that the bid is accepted and the bidder shall fail to promptly enter into a written contract and furnish the required bond. Direct inquiries to Engineer’s Project Manager Brandon Anderson at (952) 953-2490. No bidder questions will be addressed after 10:00 am on Friday, March 4, 2022. Bid Security in the amount of 5 percent of the amount of the Bid must submitted through Surety 2000 and accompany each Bid in accordance with the Instructions to Bidders. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 30 days after the date and time set for the Opening of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner. Pamela J. Gackstetter, City Clerk City of Apple Valley, Minnesota
Bid Protests Not Available

Similar Past Bids

Apple valley Minnesota 11 Feb 2022 at 5 AM
Apple valley Minnesota 12 Mar 2021 at 5 AM
Roseburg Oregon 13 Aug 2020 at 7 PM
Columbia South carolina 29 Oct 2021 at 4 AM
Columbia South carolina 29 Oct 2021 at 4 AM

Similar Opportunities

Mississippi 22 Jul 2025 at 7 PM
Pennsylvania 07 Aug 2025 at 4 AM (estimated)
Pennsylvania 07 Aug 2025 at 4 AM (estimated)
Allentown Pennsylvania 14 Jul 2025 at 6 PM
Medical Science Building - 7E Renovation (CP2400920) On January 26th 2024 a fire and explosion occurred on the 7th floor of MSB in the east wing laboratories. Physical damage was extensive within the high impact area of approximately 5000 SF impacting interior construction including mechanical electrical and plumbing infrastructure, exterior windows, casework and finishes. ed and destroyed lab casework, and damaged interior finishes. More limited damage extended to other areas of the east wing. Existing windows, mechanical, electrical, plumbing, fire suppression, and fire alarm systems were damaged and will need to be replaced in the high impact area and partially replaced or repaired where the impacts of the incident extended to other areas of the 7thy floor. The repair project will return the 7th floor east wing to service for research. The project scope includes renovating approximately 11,800 square feet of high and low impact areas of the 7th floor. The project includes an alternate restroom renovation designed to meet current codes. Infrastructure repair and replacement includes wet pipe fire suppression, acid waste & vent stack replacement, sanitary waste & vent stack replacement, domestic water and lab water systems, lab gas replacement, plumbing equipment replacement, telecom infrastructure, and window replacement. Laboratory repairs include fume hood and laboratory replacement, and required laboratory sinks, eye wash, and infrastructure needed to support specialized laboratory equipment. The project will develop two separate sets of bid documents for competitive bidding, one of which will capture the preexisting laboratory build out and one that modifies the previous existing laboratory design to more closely align with ongoing lab renovations in other areas of the building and the long range masterplan for the Medical Science Building. Base Estimate & Alternates: $4,180,000.00
Location Unknown 29 Jul 2025 at 4 AM