• Prototype Vehicles - increase maximum qty from 7 to 9;
• C4ISR Material/Integration for Prototype Vehicle - increase maximum qty from 7 to 9;
• Surrogate Armor Kit - increase maximum qty from 1 to 3; and
• Conduct pre-Critical Design Review (CDR) vehicle test.
This increase is required in order to conduct PQT at multiple test sites, run the necessary test miles and events, and be able to remain on program schedule to meet the required delivery schedule of the production vehicles. Additionally, the ability to conduct a pre-CDR vehicle test is required in order to lower Government risk prior to locking down the configuration in the CDR. Substitution of these items with incompatible products would void test results utilized for safety release and fielding to Special Operations Forces. The pursuit of full and open competition would result in unacceptable delays and substantial duplicate costs. All questions and comments regarding this matter should be directed to Mrs. Verdetta Weaver at [email protected].