The purpose of this contract is to install four Mini-Split Heating and Cooling Ductless HVAC Systems with wired thermostats for three residence houses and one meeting room located in the Mt. Baker Ranger District. Work includes remove and dispose of three existing oil furnaces heating, upgrade electrical panel for installation of ductless HVAC systems and wires to code.
The project work area is located ¼ mile across from the Glacier Public Service Center in the Mt. Baker Ranger District.
Glacier Public Service Center
1094 Mt. Baker Hwy
Glacier, WA 98244
DESIRED START DATE
August 19th, 2016
PERIOD OF PERFORMANCE
Sixty (60) calendar days
CONTRACT TYPE
Firm-Fixed-Price (FFP), Construction Contract
PROJECT LOCATION
State: Washington; Counties: Whatcom, Districts: Mt. Baker.
PRE-BID CONFERENCE
There will not be a pre-bid conference.
TECHNICAL POINTS OF CONTACT
Thomas Warter at (425) 783-6082 or e-mail [email protected]
The Government's estimated price is between $25,000 and $100.000. This project is 100% set aside for Small Business. Bonding is required.