State Bid

Last Updated on 20 Jul 2022 at 4 AM
Location Unknown

GIS Masterplan

Solicitation ID TOL2022021
Posted Date 20 Jul 2022 at 4 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency The Town Of Lunenburg:
Location United states
Point Of Contact Not Available
Synopsis Not Available
Bid Protests Not Available

Similar Past Bids

Location Unknown 12 Jul 2022 at 4 AM
North carolina 10 Aug 2020 at 6 PM
North carolina 10 Aug 2020 at 6 PM
Location Unknown Not Specified
Louisville Colorado 17 Jul 2023 at 8 PM

Similar Opportunities

Medical Science Building - 7E Renovation (CP2400920) On January 26th 2024 a fire and explosion occurred on the 7th floor of MSB in the east wing laboratories. Physical damage was extensive within the high impact area of approximately 5000 SF impacting interior construction including mechanical electrical and plumbing infrastructure, exterior windows, casework and finishes. ed and destroyed lab casework, and damaged interior finishes. More limited damage extended to other areas of the east wing. Existing windows, mechanical, electrical, plumbing, fire suppression, and fire alarm systems were damaged and will need to be replaced in the high impact area and partially replaced or repaired where the impacts of the incident extended to other areas of the 7thy floor. The repair project will return the 7th floor east wing to service for research. The project scope includes renovating approximately 11,800 square feet of high and low impact areas of the 7th floor. The project includes an alternate restroom renovation designed to meet current codes. Infrastructure repair and replacement includes wet pipe fire suppression, acid waste & vent stack replacement, sanitary waste & vent stack replacement, domestic water and lab water systems, lab gas replacement, plumbing equipment replacement, telecom infrastructure, and window replacement. Laboratory repairs include fume hood and laboratory replacement, and required laboratory sinks, eye wash, and infrastructure needed to support specialized laboratory equipment. The project will develop two separate sets of bid documents for competitive bidding, one of which will capture the preexisting laboratory build out and one that modifies the previous existing laboratory design to more closely align with ongoing lab renovations in other areas of the building and the long range masterplan for the Medical Science Building. Base Estimate & Alternates: $4,180,000.00
Location Unknown 29 Jul 2025 at 4 AM