Point Of Contact Not Available
Elements of the work shall include, but is not limited to: Removal of existing play area equipment and play area surfacing; minor modification of existing drainage system and play area containment concrete curb; installation of concrete paving, ADA ramp, new play equipment and adult fitness equipment provided by Owner; installation of play area engineer wood fiber safety surfacing and playground grass safety surfacing system; installation of site furnishings; planting, sodding, and restoration of disturbed site. Additive #1: 6 Picnic Tables, 2 BBQ Fixtures, and 3 Airplane Shadows on Concrete. ENGINEER’S ESTIMATE: Base: $165,480.00; Additive1: $18,879.89
Bid Protests Not Available