-Perform troubleshooting and make adjustments to correct the starboard bridge wing EPIC node fault which occurs when steering from wing station.
Answer:
This has not occurred recently, but in years past, the system indication would annunciate when the captain went out to the stbd bridge wing to maneuver.
Question related to Power Supply:
-For 7.3.7 MEL 503.1 (power supply), since listed MELs from the EPIC endpoint status, 503.1 is the remote for JETS to push video and audio. Please ensure this is the correct part and if it is solely the power supply and not the entire unit.
Answer:
This has been resolved.
Question Material/Parts Required by Section 7.3:
Typically, we ship required material and parts to an MSC location and MSC ships from there to the ship. This will be one of the assumptions in our quote/proposal. Can you please provide a Ship To address for the material/parts?
Answer:
Ship to address is as follows:
USNS CARSON CITY
c/o JADRO AGENT
KOBLEROV TRG 2
RIJEKA, CROATIA 51000
POC: GORAN SARLIJA
+385 99 244 2215
Forward ALL tracking info to include shipping documents to: [email protected]
All other terms and conditions remain unchanged.