This project will have two options.
Option #1 will consist of road reconditioning, creation of rolling dips, and surfacing with 2” of surface aggregate course on a 14’ wide roadbed. This project will include approximately 4.977 miles of FSR 103.
Option #2 will consist of road reconditioning and creation of rolling dips. This project will include approximately 4.977 miles of FSR 103, 1.227 miles of FSR 103A, and 1.6 miles of FSR 103B. There will be no surface aggregate added to the roads.