State Bid

Last Updated on 27 May 2022 at 4 AM
bid
Clovis California

Fowler Street Improvements

Solicitation ID CIP 21-10
Posted Date 27 May 2022 at 4 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Clovis
Location Clovis California United states
This project consists of street improvements on Fowler Avenue from Alluvial to Nees Avenue, approximately ±0.5 mile. Construction shall include, grinding, asphalt paving, ADA concrete improvements, adjustment of existing sewer and storm drain manholes, water valves to finish grade, installation of new traffic signal loop detectors, traffic signal modifications, new traffic signal cable and new loop amplifiers within the existing traffic signal controller cabinet, removal and replacement of existing traffic signal loops, application of new traffic markings and signs to current MUTCD standards.
Bid Protests Not Available

Similar Past Bids

Clovis California 10 Jul 2023 at 4 AM
Clovis California 15 Jul 2015 at 5 PM
Clovis California 29 Apr 2016 at 7 PM
Clovis California 28 Apr 2016 at 4 PM
Clovis California 18 May 2020 at 4 AM

Similar Opportunities

Clovis California 15 Jul 2025 at 6 PM
Patrick air force base Florida 16 Jul 2025 at 6 PM
Redstone arsenal Alabama 23 Jul 2025 at 8 PM