SF 1449 CONTINUED SCHEDULE:
ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 |
Contractor shall provide one (1) ten-ton forklift with a |
20 |
DAY |
|
|
|
driver with rough terrain capability to be used at LSA |
|
|
|
|
|
for loading and unloading as required. Contractor shall |
|
|
|
|
|
provide a licensed operator on-site, available within |
|
|
|
|
|
30 minute recall basis. Contractor shall be responsible |
|
|
|
|
|
for all required maintenance of the forklift, repair parts, |
|
|
|
|
|
fuel and all costs associated with the repair and |
|
|
|
|
|
maintenance of the forklift. If the forklift should become |
|
|
|
|
|
damaged during the execution of this portion of the |
|
|
|
|
|
contract. the contractor shall also repair or replace the |
|
|
|
|
|
forklift at no additional cost to the US Governement |
|
|
|
|
|
within 6 hours of notification from the COR. Contractor |
|
|
|
|
|
shall also be responsible for the security of the forklift |
|
|
|
|
|
when it is not in use. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0002 |
Period of Performance: Contractor shall provide one |
|
|
|
|
|
(1) ten-ton forklift for the period beginning 24AUG09 to |
|
|
|
|
|
07SEP09 and again from 15-20SEP09. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0003 |
Delivery - Contractor shall deliver one (1) five to ten-ton |
|
|
|
|
|
forklift to Kozara Barracks in Banja Luka, Bosnia- |
|
|
|
|
|
Hertzegovina to the LSA and pickup at the same location. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|