Update 1/22/2020 Amendment 003 to clarify two issues. This does not change the due date. No further questions will be excepted.
******************
Update 1/13/2020 Amendment 002 to add a photo and anwser two questions. This does not change the due date
******************
Update 1/06/2020 Amendment 001 This does not change the due date
******************
12010920Q0008 Solicitation, the pre-solicitation notice was 12010920R0005
This project is comprised of all required labor, equipment and materials necessary to perform the following work including but not limited to: Dewatering, excavation, rock excavation, installation of footings and superstructure, borrow material from nearby quarry for material, haul, reconstructing streambed and banks with instream rock structures, backfill, and soil erosion control.