State Bid

Last Updated on 12 May 2021 at 4 AM
ITB
Pearland Texas

Fiber Backbone - Magnolia Parkway (Cullen Parkway to Harkey Raod

Solicitation ID 0421-38 Addendum 1
Posted Date 12 May 2021 at 4 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency City Pearland
Location Pearland Texas United states
A new 2-mile fiber optic connection between City’s existing network connection at the Harkey Road intersection traffic controller cabinet and extending the fiber network to the CR 89 (Cullen Parkway) / Magnolia Parkway intersection traffic controller cabinet. This project will add 2 traffic signal controllers along Magnolia Parkway to the City’s fiber optic network. The intersections to be added are Magnolia Parkway at FM 1128 (Manvel Road) and Magnolia Parkway at Cullen Parkway. Additionally, the fiber connection will connect the West Mary’s Creek Storm Water Pond Pump Station to the fiber network. The fiber run will traverse east to west along the southside of Magnolia Parkway. The fiber optic connection will carry 96-strand and a 12-strand single mode fiber the entire project length of approximately 10,680 feet.
Bid Protests Not Available