The Sacramento District of the U.S. Army Corps of Engineers has an upcoming acquisition to establish a contract to implement erosion protection measures at Feather River (FHR) River 1.0 left bank (L), approximately eight miles north of Sacramento International Airport and adjacent to the Garden Highway. The eroded site extends for approximately 1,050 linear feet of shore-line. The erosion protection measure is to place quarry stone, soil-filled quarry stone, and non-woody vegetation on the existing erosion site. The erosion repair includes the construction of a low riparian bench. Construction will consist of quarry stone placed above and below the mean summer water surface elevation (MSWSE) and a layer of soil placed on top of soil-filled quarry stone above the MSWSE. A wetland bench will be constructed below the MSWE. Work includes trimming and clearing of vegetation, placing quarry stone on the lower slopes, and soil-filled quarry stone on the upper slopes of the erosion site. This contract also includes erosion control seeding.
Acquisition Information:
This acquisition is proceeding as a HubZone set-aside.
Estimated Cost Range is between ($5,000,000 $10,000,000). FAR 36.204(g)
Period of Performance (POP) for Construction: In-water construction must be completed no later than 30 November 2019, due to requirements of biological opinions of agencies responsible for enforcing the Endangered Species Act. Estimated Notice to Proceed (NTP) date is 7/30/2019. The POP is 320 days NTP.
This Procurement will be conducted under PSC CODE: Y1PZ, NAICS Code: 237990. The size standard for this code is $36,500,000. All questions should be directed to the Contract Specialist, Deanna C. Zemovich e-mail [email protected].
It is anticipated that the RFP will be issued on or about April 18, 2019, for downloading at the Government's website at http://www.fedbizopps.gov/. No paper copies will be issued.
The specific date and time will be identified in the solicitation.
OFFERORS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
ORDERING SOLICITATION: Plans and specifications will NOT be provided in hard paper copy or CD-ROM format. The solicitation and all amendments for this acquisition will be posted on a secure Government website known as FedBizOpps (www.fbo.gov) once the RFP is issued. Viewing/downloading documents from FedBizOpps will require prior registration in System for Award Management (www.sam.gov). If you are a first-time FedBizOpps user, you will also be required to register in FedBizOpps (www.fbo.gov) before accessing the RFP documents. To register, click on the Register Now button in the Vendors Block and follow the instructions. The following information will be required: System for Award Management (SAM) Marketing Partner Identification Number (MPIN); DUNS Number or Cage Code; Telephone Number; and E-mail Address. Once registered with FedBizOpps, interested parties will then be able to log in and access the RFP documents.
Important Note: Solicitation documents can be accessed ONLY via FedBizOpps. Please note that ALL contractors who want to register with FedBizOpps must be registered in SAM, and have a MPIN, DUNS number or Cage code. For further information, please click on the FedBizOpps homepage link and the Vendor User Guide. The only PLAN-HOLDER'S/BIDDER'S LIST now available is via FedBizOpps. When viewing the Synopsis/Pre-solicitation Notice, you will click on the ‘ADD ME TO INTERESTED VENDORS' to enter your information. This function does not, however, allow you to identify yourself as a Prime or Sub. It is recommended that you identify your category in parentheses at either the beginning or end of your company name. For example: (Prime/Sub) XYZ Construction, or XYZ Construction (Prime/Sub). IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY AMENDMENTS OR CHANGES TO THE SOLICITATION.