Point Of Contact Not Available
The Project generally consists of the final design and construction of New combination FireStation and ARFF at Fernandina Beach Municipal Airport. Building to consist of PEMB apparatus area with 4 bays including concrete plank mezzanine with support spaces below enclosed by concrete block. Attached to the PEMB is a concrete block and plank support building with Meeting Room, Offices, Kitchen, Fitness Room, Dayroom, Bunk Rooms and Bathrooms, etc.. Exterior of building to generally consist of a combination of PEMB, masonry walls and mansard roof with metal framing and metal roofing. Site area took into consideration the preservation of a majority of existing trees while providing a landscape plan with minimal new trees and landscaping since the site is adjacent to the end of Runway 4-22. The site area is designed to contain stormwater on site. Additional site work will consist of but not be limited to the relocating of the existing electrical power supporting the Airfield Electrical Vault including the relocating of Airfield Electrical suppling the airfield.
Bid Protests Not Available