The Work consists of construction of a new fats, oils and grease (FOG) facility, including but not limited to procurement, installation and start-up of storage tanks, mixing pumps, digester feed pumps, offloading pumps, odor control, heat exchanger, cogen heat loop, Owner furnished screening equipment, associated equipment concrete pads, catch basins, routing of new piping and conduits, connection to existing piping, electrical panels, instrumentation, new lighting and security camera, slab on grade site with a containment wall, truck offloading area, and removal and replacement of existing asphalt concrete pavement. the work also includes partial demolition of existing cart barn garage metal roofing, fences, roof posts, rolling gate and associate appurtenances, per specifications.
Bid Protests Not Available