Please see attached document!
Engineering change order for the Fairlead Beam top plate.
"The top plate is 1/2" to meet the KIP Wheel Load of a C-17 per UFC 3-260-01
Airfield and Heliport Planning Design dated 17 Nov 2008.
"
Soliciation Close Date has also been extended til 06 May 2019 at 0900AM Central to accomodate to change/clarification in specification.