Federal Bid

Last Updated on 09 May 2015 at 8 AM
Sources Sought
Virginia

EPDM Roof Replacement Project, Natick, Massachusetts

Solicitation ID W912WJ-15-X-0024
Posted Date 17 Apr 2015 at 4 PM
Archive Date 09 May 2015 at 5 AM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Department Of Defense
Location Virginia United states
The U.S. Army Corps of Engineers, New England District is issuing a Sources Sought Announcement to determine interest, availability and capability of 8(a), HUBZone, Service-Disabled Veteran-Owned and Small Business concerns. The NAICS code for the work is 238160. Work under this contract is expected to begin in October 2015 and extend over a 3-4 month period. The estimated construction cost is between $1,000,000 and $5,000,000.

The project includes the demolition of existing roofing complete to the roof deck (including roof membrane, insulation, flashing, gutters, trim and accessories). A new single ply EPDM membrane roofing and new rigid insulation will be provided as well as new gutters, edge metal, flashings, trim and accessories as necessary for a complete installation. The design also includes the installation of a lightning protection system; the building does not currently have a lightning protection system. The existing roofing system on Building 20 is approximately 20,000 sq. ft., is composed of rigid insulation, wood decking, wood blocking, fully adhered EPDM material, and associated items installed over a concrete roof deck, on a single roof level.

Interested firms should submit a capabilities package to include the following: business classification (i.e. HUBZone, etc.) as well as qualifications of the team and experience in performing the work requirements stated above with the primary focus being on EPDM roof replacement projects of similar size and magnitude. In addition, the Contractor shall provide proof of being a Certified Installer of an EPDM Roofing Manufacturer's system. Please include five specific examples of the firm's experience performing the work requirements stated above. The projects must have been performed within the last five years. The past EPDM roof replacement experience shall have been performed over the past five (5) years and shall include: 1) project name and location; 2) initial and final cost of the project; 3) firm(s) performing the work on the project and percentage performed by each; 4) Customer point of contact with contact information (address, telephone, job title, etc.); 5) date of project construction. Also, indicate the team subcontractors that will be used to support the offeror's effort on the project requirements mentioned above. Proof of bonding capability is required. Responses are due May 8, 2015. Responses should be addressed to the U.S. Army Corps of Engineers, New England District, 696 Virginia Road, Concord, MA 01742-2751, ATTN: Stephen Jones, [email protected]. Responses are limited to twenty pages. Firms interested shall provide the above documentation in one original form and one copy. The Government will not pay for any material provided in response to this market survey nor return the data provided. This notice is for information purposes only and is not a request to be placed on a solicitation mailing list nor is it a Request for Proposal (RFP) or an announcement of a solicitation. The results of this survey will be considered to be in effect for a period of one year from the date of this notice.

Bid Protests Not Available

Similar Past Bids

Natick Massachusetts 29 May 2024 at 12 PM
Natick Massachusetts 31 May 2024 at 8 PM
Natick Massachusetts 31 May 2024 at 5 PM

Similar Opportunities

Puget sound Washington 27 Apr 2026 at 3 AM
Location Unknown 30 Sep 2025 at 4 AM (estimated)
Location Unknown 30 Sep 2025 at 4 AM (estimated)