For this requirement the Contractor shall provide all management, tools, supplies, equipment, and labor necessary to perform all work in accordance with the specifications of the Statement of Work (25 Apr 19). Work includes leveling of the existing floor to support the shelving structure and installation of the mobile/static shelves to include leveled rail and deck with garage mat deck cover, and dual control and access ramps.
Bid Protests Not Available