Catholic Chapel (B699)
• Remove this facility from campus steam supply
• Provide new, high efficiency gas fired boilers
• Connect to existing gas main adjacent to Washington Road
• Confirm space availability for boiler
• Confirm existing gas main size, pressure and capacity
Jewish Chapel (B750)
• Remove this facility from campus steam supply
• Provide new, high efficiency gas fired boilers
• Connect to existing gas main adjacent to Washington Road
• Confirm space availability for boiler or possible addition
• Confirm existing gas main size, pressure and capacity
Washington Hall (B745 A/B)
• Washington Hall (B745) contains air curtains at each of (6) six entrance vestibules to the Dining Hall. In each case a wall-mounted thermostat modulates a heating water control valve for temperature control while a door switch controls the operation of the fans. The air-curtain fans are only supposed to run when the interior doors are opened with a time delay to prevent short cycling. Currently, all air curtains are in operation regardless of the position of the interior doors.
This project will address this deficiency.
• Modify cabinet unit heaters to maximize discharge efficiency.
PE Training Facility (B708)
• The Reception area lighting deficiency causes the facility to operate court lighting to illuminate the reception and circulation areas.
• Improvement of the reception and entry circulation lighting will reduce operation of court lighting and save energy
Period of Performance: Approximately 550 calendar days after Notice to Proceed. Notice to Proceed is anticipated to occur between August 2017 and September 2017.
Interested businesses shall respond to this Sources Sought Synopsis by submitting two (2) examples (limit of three (3) total pages) of previous experience in the design and construction of energy efficiency projects and similar in cost magnitude (greater than or equal to $750,000). Responders are requested to include their DUNS and CAGE numbers as well as their business size and type of small business, as well as Joint Venture information, if applicable. The information submitted will be considered in the development of the acquisition strategy to support this program.
All interested contractors must be registered in the System for Award Management (SAM) (www.sam.gov) to be eligible for award of Government contracts. 8(a) and HUBZONE firms must be certified by the Small Business Administration (SBA).
All interested businesses responding to this Market Research Synopsis shall be limited to the information required above and shall submit via email no later than 4 pm EST on Tuesday, 1 December, 2016. Please provide your responses to [email protected]. Respondents will not be notified of the results of the evaluation.