*** Update***
4/7/2021 - Added Site visit sign-in sheet
3/25/2021 - Amendment 0001- Extended proposal due date and extended question period.
Dugw ay Proving Grounds (DPG) Microgrid
The requirement is for the design and construction of a complete and operational microgrid, w hich includes a new battery energy storage system and a Supervisory Control And Data Acquisition (SCADA) system to be installed into the existing base utility grid. The existing base utility grid w ill be controlled by a new Microgrid Control System that integrates an existing 12-MW diesel generator plant to an existing 2-MW solar array, and a currently-under-construction utility-grade database system and total building energy management control system (EMCS),as well as a future 2-MW solar array.