Synopsis
Defense Supply Center Richmond (DSCR) B208 Glass Replacement
This is a synopsis for construction prepared in accordance with the format in FAR Part 36, using Simplified Acquisition Procedures found at FAR Part 13, as supplemented with additional information included in this notice. The solicitation number SP4703-25-Q-0046 is issued as a request for quote (RFQ). The resulting contract will be a firm-fixed price type award. This acquisition is set-aside for 100% small businesses. The North American Industry Classification System (NAICS) Code is 238350 (Finish Carpentry Contractors). The small business size standard is $19M. Department of Labor Wage Determination based on location of the service provided (Chesterfield County, VA). Partial proposals will not be accepted.
For an offer to be considered for award, the contractor must be within a commutable driving distance to the DSCR facility. A 120-mile radius from DSCR is considered the commutable radius.
Award will be made to the lowest priced, technically acceptable (LPTA) offeror that meets the requirements stated in the Statement of Work and the solicitation. Also refer to clauses and provisions includes in this notice. Past performance will be considered a part of Technical Acceptability, and the Contracting Officer will pull contractor data from CPARS and SPRS.
The contractor must be registered in the System for Award Management (SAM) prior to award. If not already registered in SAM, go to the SAM website www.sam.gov to register prior to submitting your quote.
All inquiries must be submitted no later than 7 business days prior to closing date. Acceptable method of quote or inquiries submission is Email to [email protected].
Questions are due on May 14,2025, end of day. Submit questions via email to [email protected].
Quotes are due May 21, 2025, end of day.
Site visit is TBD and will be published on SAM.gov under this solicitation listing.
Access to Defense Supply Center Richmond is dictated by the language at the following location:
https://www.dla.mil/Aviation/Installation/Visitors-and-ID-Office/
The points of contact (POC) for this requirement are Nic Mace ([email protected]).
Reference Attachment 1 - Statement of Work (SOW) for additional work scope and details.
MAGINITUDE OF CONSTRUCTION
36.204 Disclosure of the magnitude of construction projects. | Acquisition.GOV
In accordance with FAR Part 36.204(a), the estimated Magnitude of Construction for this project is between $25,000.00 and $100,000.00
LIQUIDATED DAMAGES
52.211-12 Liquidated Damages-Construction.
LIQUIDATED DAMAGES-CONSTRUCTION (SEPT 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of _$500_ for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.