USCGC PEA ISLAND, November 10, 2010 - January 14, 2011
USCGC OCRACOKE, February 23, 2011 - April 29, 2011
USCGC NANTUCKET, May 18, 2011 - July 22, 2011
USCGC KNIGHT ISLAND, August 17, 2011 - October 21, 2011
The contractor shall provide all labor, material and equipment necessary to dry dock and repairs to the USCGC PEA ISLAND (WPB-1347), USCGC OCRACOKE (WPB-1307), USCGC NANTUCKET (WPB-1316), and/or USCGC KNIGHT ISLAND (WPB-1348). The scope of work is for the overhauling, renewing and repairing of various items aboard the USCGC PEA ISLAND (WPB-1347), USCGC OCRACOKE (WPB-1307), USCGC NANTUCKET (WPB-1316), and/or USCGC KNIGHT ISLAND (WPB-1348). This work will include, but is not limited to:
Routine Drydocking, Provide Temporary Logistics, Clean and Inspect Fuel Service Tanks, Clean and Inspect Fuel Stowage and Overflow Tanks, Clean and Inspect Oil and Oily Waste Tanks, Clean and Inspect Sewage Collection and Holding Tanks, Clean and Inspect Grey Water Collection and Holding Tanks, Perform Air Test of Interior Compartments, Clean Sewage Piping System, Clean Grey Water Piping System, Clean and Disinfect Potable Water Tanks, Preserve and Disinfect Potable Water Tanks - Partial or 100%, Preserve Sewage Collection and Holding Tank - Partial or 100%, Preserve Grey Water Collection and Holding Tank - Partial or - 100%, Preserve Oil and Oily Water Tanks - Partial or 100%, Inspect MDE Exhaust System, Remove, Inspect, and Reinstall Propellers, Repair Propeller Root Erosion, Remove, Inspect, and Reinstall Propeller Shafts, Overhaul Mechanical Shaft Seal Assemblies, Renew Water-Lubricated Propeller Shaft Bearings, Clean and Inspect Heat Exchangers, Overhaul and Renew Sea Valves, Overhaul and Renew Firemain Valves, Overhaul and Renew Bilge and Ballast Valves, Overhaul Duplex Sea Strainers, Overhaul Stabilizing Fins, Overhaul Steering Gear Components, Remove, Inspect and Reinstall Rudder Assemblies, Inspect and Maintain Cathodic Protection System Renew CAPAC Anode Assembly, Renew Speed Doppler and Overhaul Doppler Valve, Renew Depth Indicating Transducer, Preserve Underwater Body - Partial or 100%, Preserve Stern Tubes, Perform Ultrasonic Thickness Measurements, Perform Aluminum Hull and Structural Repairs - 1/4", 3/16", or 5/16" Plate, Perform Hull and Structural Plating Repairs - Crack, Eroded Weld, or Overlay Welding (Aluminum), Perform Steel Hull and Structural Plating Repairs - 5, 7.5, or 7.65 Pound, Perform Hull and Structural Plating Repairs - Crack, Eroded Welds, or Overlay Welding (Steel), Repair and Preserve Forward Peak Compartment, and Preserve Forward Void, Preserve Bilge Surfaces in Forward Auxiliary Machinery Space-Partial, Preserve Bilge Surfaces in Aft Machinery Space, Renew Both Ship Service Diesel Generators, Preserve Port & Starboard Strut Cofferdams - 100%, Preserve and Insulate Aft Steering Compartment, Perform Structural Repairs - Install Deck Grating System in Forepeak and Renew Deck Drain Cup Assembly, Preserve Freeboard - 100%, Preserve Superstructure, Perform Hull and Structural Plating Repairs -Corrugated Plate (4.0-Pound), Perform Steel Structural Member Repairs -1" x 3" Steel T-Bar Framing, Composite Labor Rate, Clean, Inspect, and Preserve Engineroom Bilge Surfaces, Renew A/C Handlers, Renew A/C Condenser, Renew Main Diesel Engine, Preserve Port & Starboard Cofferdams - 100%, GFP Report, and Laydays.
All welding and brazing shall be accomplished by trained welders, who have been certified by the applicable regulatory code performance qualification procedures. All reference documents are available for viewing at 300 East Main Street, Suite 600, Norfolk, VA 23510-9102. Drawings are now available on CD-ROM. The CD-ROM is available free of charge to contractors upon request not later than four (4) days from the solicitation issuance. The CD-ROM(s) contain WINDOWS compliant raster/vector formats (e.g.*.DWF, etc). For information concerning this acquisition, contact Ms. Tomeka Evans at (757) 628-4666 or by e-mail at [email protected].