Point Of Contact Not Available
The project work will include safeguarding a total of 37 features including 35 adits, 1 shaft and 1 subsidence features. Closure methods will include grates, corrugated steel pipes, backfill, polyurethane foam, bulkhead, and cable nets.
Bid Protests Not Available