Grading/earthwork, including in-water work; partial demolition of existing road; widening and rehabilitation of existing road; construction of trail; paving; drainage; guardrail installation; shoreline protection installation; signal and electrical work; signing and striping; planting; irrigation; seeding and erosion control; boat ramp demolition; boat ramp replacement. CONSTRUCTION COST ESTIMATE: $6.3M MANDATORY PRE-BID MEETING ON THURSDAY, SEPTEMBER 2nd, 2021 AT 10AM Bids shall be uploaded electronically to the Park District plan room link above via the “Submit Bid” tab on the Doolittle Trail and Shoreline Improvements Project page before 2:00 p.m. on Thursday, September 23, 2021. Bids will be publicly opened at that time via online Zoom meeting at the link below: Topic: Bid Opening: MLK, Jr. Shoreline – Construct Doolittle Trail Time: Thursday, September 23, 2021 02:00 PM Pacific Time (US and Canada) Join Zoom Meeting https://ebparks.zoom.us/j/81576849427
Bid Protests Not Available