Point Of Contact Not Available
MCI Norfolk, Watewater Plant Replacement, Norfolk, MA. This project consists of a replacement of a wastewater treatment facility, with some elements of renovation. Work involves replacing the existing Membrane Biological Reactor plant with an activated sludge plant, including but not limited to: construction of new distribution box and post-aeration tank, retrofitting existing circular tanks into secondary clarifiers, modifications to existing biological reactors, construction of a new two-story pump station within a structure, replacement of tertiary filters, replacement of process equipment and piping, and associated electrical, instrumentation, HVAC, and plumbing. This Project bid in accordance with M.G.L. Chapter 30 Section 39M Sitework Only Projects and Building Projects $50,000 to $150,000.
Bid Protests Not Available