1. BLOCK I - CRAWFORD COUNTY CLEARING, TILLING, SEEDING AND FERTILIZING TOTAL NUMBER OF ACRES = 65.8 ACRES WORK MUST BE COMPLETED BETWEEN MAY 25TH AND JULY 1ST, 2019 1. PROVIDE SEED AND FERTILIZER. 2. TILLAGE OF OPENINGS MAY BEGIN TWO WEEKS PRIOR TO THE PLANTING DATE. 3. REMOVE ALL DOWNED TREES, LIMBS, BRUSH, STUMPS, DEBRIS, AND EXPOSED ROCKS FROM TILLAGE BIGGER THAN 6" FROM OPENINGS. 4. REMOVE LIMBS ON EDGE TREES TO ALLOW PLANTING TO OPENING EDGE. 5. DISK OR PLOW SOIL TO A PLANTABLE CONDITION, (NO GREEN PATCHES - ALL HERBACEOUS BROKEN AND TURNED SEVERAL TIMES IF NEEDED IN HEAVY SOD) TO FORM A 6" SEEDBED OF MINERAL SOIL. 6. APPLY 19-19-19 DRY GRANULAR FERTILIZER AT THE RATE OF 200 LBS PER ACRE. FERTILIZER MUST BE DISKED INTO SOIL PRIOR TO PLANTING. 7. APPLY BUCKWHEAT SEED AT A RATE OF 75 LBS. PER ACRE. THE SEEDBED MUST BE LIGHTLY DISKED AND THEN CULTI-PACKED AFTER SEEDING OF BUCKWHEAT IF A BROADCAST SEEDER IS USED. 8. APPLY WHITE LADINO CLOVER SEED MIX AT A RATE OF 15 LBS. PER ACRE. THE SEEDBED MUST BE CULTI-PACKED AFTER SEEDING OF RGS MIX WHETHER A BROADCAST SEEDER OR GRAIN DRILL IS USED. 9. REPLACE ALL BERMS AFTER COMPLETION OF WORK. SITE LIST AND LOCATION INFO ON THE STATEMENT OF WORK. MAPS ATTACHED TO INVITATION TO BID.
Bid Protests Not Available