1. ADDENDUM #1: THE PREVAILING WAGE RATE REQUIREMENT IS BEING REMOVED FROM THIS PROJECT, ITEM #23, PAGE 5 OF THE CONTRACT DOCUMENT. THE BID DUE DATE IS ALSO BEING EXTENDED UNTIL FRIDAY, AUG. 24, 2018 AT 3:00 P.M. THE PROJECT WILL CONSIST OF NEW METAL ROOFS FOR 100, 50, 25-YARD LINES, INCLUDING RANGE TOWER AND WORK SHED. THE 100,50,25 AND WORK SHED COLOR FOREST GREEN 29-GAUGE OPEN FASTENERS TO MATCH THE EXISTING METAL ROOF, DRIP EDGE AND FACIA. FOREST GREEN GUTTERS, DOWN SPOUTS, FACIA FLASHING TO BE INSTALLED. RANGE TOWER WILL CONSIST OF UNACLAD 24-GAUGE HIDDEN FASTENERS, COLOR FOREST GREEN, WITH FOREST GREEN GUTTERS, DOWN SPOUTS, FACIA FLASHING TO BE INSTALLED.
Bid Protests Not Available