1. Minimum Specifications Required:
- Diamond Plating will be approximately 27.5"- 32" tall and will go from floor to bottom of window seals around the weight room. Panels will need to be cut to measure 4-5 feet, or a measurement that includes the least amount of seams as possible, in width and need to go around corners, power outlets, fire hydrants, and any other wall fixture(s). Diamond plating must be installed before mirrors are installed so contractor needs to be willing to work with mirror installer. Total approximate material needed is 265 ft.
- East wall 32' X 49"
- South wall 32' X 49"
- West wall 32' X 49"
2. Also included:
- All materials and labor costs to included diamond plating, mounting materials and freight costs to F.E Warren AFB, WY.