Point Of Contact Not Available
Please complete the information summary form attached here for your application to be considered: https://forms.gle/yxGZBzHYacgbBFJ6A Project: PCOM New Facility Study, NC State Project # 202213035 Description: For the College of Veterinary Medicine (CVM) Main building, remove all existing, non-LED light fixtures (estimated at approximately 4000 lights total with 50% T12/ 50% T8) and replace them with new or retrofitted LED fixtures. Include dimming and occupancy sensing to meet the current energy conservation code. Download the project summary below: CVM-LED-Project-SummaryDownload Contact: For specific project inquiries – Julie Snead,
[email protected] or (919) 513-7807 https://facilities.ofa.ncsu.edu/category/ads/ Closing Date: 5:00 pm, January 31, 2023 Project Budget: The total project budget of $740,000 incorporates design, construction, and all associated soft costs. Questions: Please submit questions about the project via the following link. All inquiries should be submitted by 5:00 pm on January 20, 2023. Question Submission Form: Submit Questions Here Question Submission Answers: View University Responses Submit Letter of Interest and SF330 Form to: Julie Snead,
[email protected]
Bid Protests Not Available