The project scope includes Asphalt deep patch mill sections of road experiencing asphalt failures. Deep patch milled areas will be filled with 4” of 25 mm Superpave Asphalt. Milling and repaving the entire road length to be flush with the existing gutter line to include 1” of ‘D’ mix asphalt binder course pavement and 1.5” of Type 1 – ‘F’ Mix (9.5mm) surface course pavement.Thermoplastic stop bar striping. Sod disturbed areas with Bermuda or in kind.
Bid Protests Not Available