The project consists of the rehabilitation of Vado Lift Station 7 which includes new submersible pumps, stainless steel piping, floats, accessories, and power/control panels, new access hatches, electrical work, generator, odor control system, and chain-link fencing. As part of this contract, 30 residential sewer service connections will be made to the DAC Utilities Sleepy Farms Wastewater collection system, and their existing septic tanks will be decommissioned to minimize the potential of groundwater contamination.
Bid Protests Not Available