State Bid

Last Updated on 16 Jan 2022 at 7 AM
Huston Idaho

DAC - Vado LS Num7 Upgrades

Solicitation ID Not Specified
Posted Date Not Specified
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Bohannan Huston
Location Huston Idaho United states
The project consists of the rehabilitation of Vado Lift Station 7 which includes new submersible pumps, stainless steel piping, floats, accessories, and power/control panels, new access hatches, electrical work, generator, odor control system, and chain-link fencing. As part of this contract, 30 residential sewer service connections will be made to the DAC Utilities Sleepy Farms Wastewater collection system, and their existing septic tanks will be decommissioned to minimize the potential of groundwater contamination.
Bid Protests Not Available

Similar Past Bids

Huston Idaho Not Specified
Huston Idaho Not Specified
Huston Idaho Not Specified