Andre Elementary: One-story interior renovation with kitchen addition. The scope includes, but is not limited to Interior MEP Renovations, flooring replacement, new doors, walls and painting not limited to Interior MEP Renovations, flooring replacement, new doors, walls and painting throughout. Walker Elementary: One-story interior renovation with MEP, walls, ceilings and paint throughout. Scope also includes new roof ply overlay work for the entire roof. All digital files included with purchase of complete printed set via file transfer. Specs seperated by section and plans by sheet names. Half Size Available upon Request NOTICE: INVITATION TO BID SCOPE OF WORK: Andre Elementary: One-story interior renovation with kitchen addition. The scope includes, but is not limited to Interior MEP Renovations, flooring replacement, new doors, walls and painting throughout. Walker Elementary: One-story interior renovation with MEP, walls, ceilings and paint throughout. Scope also includes new roof ply overlay work for the entire roof. PROPOSED CONSTRUCTION BUDGET: $13,695,504.22 PRE – BID-DATE & LOCATION: Monday, November 15, 2021 at 2:00 PM at Cypress-Fairbanks Independent School District, Facilities & Construction Conference Room, 11430-B Perry Road, Houston, Texas 77064. Representatives of the Architect and Owner will be present at this meeting. All offerors are encouraged to attend. BID-DATE & LOCATION: Thursday, December 2, 2021 Base Proposal: 2:00 PM Alternate Proposal: 3:00 PM Cypress-Fairbanks Independent School District PROPOSAL Facilities and Construction OPENING: 11430 B Perry Road Houston, Texas 77064 (281) 897-4000 BID METHOD: Competitive Sealed Proposals OWNER: Cypress-Fairbanks Independent School District 10300 Jones Road Houston, Texas 77065 Representative: Mr. Matthew Morgan, Assistant Supt. of Facilities and Construction
Bid Protests Not Available