All labor, materials, tools, and equipment necessary to perform the removal of the existing sodium hypochlorite feed piping and five chemical metering pumps, motors and appurtenances; installation of new piping and metering pumps, motor operated valves, and pipe hangers and supports; connection of the new metering pumps to the existing control panels; and relocation of an existing flow meter.
Bid Protests Not Available