State Bid

Last Updated on 23 Jul 2023 at 1 PM
IFB
Frisco Texas

Custer Road (Westridge Blvd. to Custer Tr.) Green Ribbon Project_22136

Solicitation ID 2307-089
Posted Date 23 Jul 2023 at 1 PM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Frisco
Location Frisco Texas United states
Point Of Contact Not Available
This project goal is to provide new median landscape and irrigation improvements along an approx. 1.7 mile segment of Custer Rd. (2478). The project begins north at Westridge Blvd. and extends south to Custer Trail. This segment will be a part of a larger 4 mile landscape project along Custer Rd. that will be funded by the City of Frisco. The proposed design concept looks to enhance the medians along Custer to provide a more pleasant pedestrian experience. The proposed landscape design includes native plantings consisting of new street trees, ornamental shrub beds, landscape edging, turf grass and drip irrigation system. This corridor currently exists on the eastern city boundary, thus serving as a primary entry into the City of Frisco. Bid Opening Virtual Meeting Information: Microsoft Teams Meeting ID: 279 650 877 983 Passcode: JYfMDg Download Teams | Join on the web Or call in (audio only) +1 469-445-0737,,347047109# United States, Dallas (877) 366-1298,,347047109# United States (Toll-free) Phone Conference ID: 347 047 109# In Person: 6101 Frisco Square Blvd., 3rd Floor Engineering, Engineering Conference Room E313, Frisco, TX
Bid Protests Not Available

Similar Past Bids

South dakota Not Specified
Location Unknown Not Specified
Location Unknown Not Specified
Location Unknown Not Specified
Provo Utah 13 Jan 2021 at 5 AM

Similar Opportunities