Amendment 001 amends the period of performance from September 15, 2016 to October 15, 2016 to May 15, 2017 to June 15, 2017.
Contractor is responsible for the furnishing of all labor, materials, equipment, supervision, and transportation required for drilling, casing, and developing two (2) six-inch stock water wells.
The desired well yield is five to fifteen gallons per minute.
The well drilling sites are located at two areas along Sage Creek, located in the Pryor Mountain Rage, Carbon County, Montana. Vicinity is located approximately 60 from Billings, MT or 55 miles from Red Lodge, MT.
Magnitude of Construction per FAR 36.204 (b) - Between $25,000 and $100,000.