Point Of Contact Not Available
It is the intent of this specification to provide for the cleaning, root cutting (as necessary), and reconstruction of approximately 1,077 lineal feet of sanitary sewer by the installation of cured-in-place pipe (CIPP). CIPP is formed by the insertion of a resin-impregnated flexible felt tube into the existing pipe. The tube is expanded in an inversion process to fit against the original conduit, and then heated to cure the resin. The finished product shall be a joint-less, structural pipe that is formed to the existing pipe. All materials, labor, and equipment shall be provided by the successful bidder, through this not-to-exceed bid price, to provide a complete “turn-key” project. MANADATORY SITE VISIT REQUIRED. ILLINOIS PREVAILING WAGE PROJECT
Bid Protests Not Available