Cumming-Hwy 369 Water Line, Settingdown Creek to Byers Rd - Proposals for the construction of the Project will be received at Cumming City Hall located at 100 Main St, Cumming, GA 30040, until Sept. 2, 2020 at 11:30am local time. At that time, the Proposals received will be privately opened, read, and scored. The Project includes the following Work: Furnishing all materials, labor, and equipment to install approx. 12,240 LF of 12-inch DIP Water Main and 900 LF of 8-inch DIP Water Main. The water main will be installed utilizing open cut, jack & bore, and free bore methods. Existing water services shall be connected to the proposed water main as indicated on the plans. Project shall include furnishing all materials, labor, equipment and any appurtenances as necessary for completion of the work described within the plans and specifications. All PROPOSAL DOCUMENTS may be downloaded at https://cecincga.com under the ‘Bid Information’ tab. Upon payment of $150 (non-refundable), Contractor shall be placed on the Plan Holders list and be eligible to submit a proposal on the project. Checks should be mailed to Civil Engineering Consultants at 4994 Lower Roswell Rd, Ste 17, Marietta, GA 30068. Hard copies of the Contract Documents will not be available. The last day for submission of questions shall be Wednesday, Aug 26, 2020. Contractor questions should be directed to Stephanie Dean in writing to
[email protected]. A mandatory pre-proposal conference for the Project will be held on Wed, Aug. 19, 2020 at 10am at City Hall, the City of Cumming, 100 Main St, Cumming, GA 30040. Proposer’s failure to attend, will result in their proposal being rejected as non-responsive.
Bid Protests Not Available