Project Manager Monica Scott
[email protected] Scope of Work: The work to be done under this contract is located at Crocker Amazon Soccer Fields (Geneva Ave/Prague Street) in San Francisco, CA. Demolition work consists of removal of asphalt and concrete paving, and synthetic turf removal and recycling. Improvement work consists of grading and drainage; concrete and asphalt paving, preparation of existing field base rock material below existing fields; and synthetic turf manufactured underlayment pad and synthetic turf installation.
Bid Protests Not Available