The Village of Cottage Grove plans to resurface W Clover Lane beginning at the east side of the intersection of N Parkview St and running approximately 1640 feet east to the west side of its connection with N Clover Lane, just past the curve. There will be a base bid, which includes a mill and overlay, along with an alternative bid which includes pulverizing and paving this section of road. The curb and gutter are anticipated to remain as they currently exist. Manhole castings and water valve boxes shall be adjusted as necessary to match new grades. The anticipated substantial completion date is August 27th, 2021 and final completion date is September 3rd, 2021. Planholders list will be updated interactively on our web address at http://www.msa-ps.com under Bidding. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. BIDDER is required to deliver the original certified check or bid bond within the 72 hours of bid opening to MSA Professional Services, Inc., Attn: Kevin Lord, PE, 1702 Pankratz Street, Madison, WI 53704. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. OWNER reserves the right to waive any informalities or to reject any or all bids. Published by the authority of the Village of Cottage Grove.
Bid Protests Not Available