The work includes the construction of approximately: 100 LF Remove and Replace Concrete Curb and Gutter 131,852 SY Mill Bituminous Pavement 17,163 TN Bituminous Mixtures 1,400 LF Concrete Curb and Gutter 560 SF Concrete Pedestrian Ramps 138 SY Hydraulic Matrix Mulch Together with numerous related items of work, all in accordance with Plans and Specifications.
Bid Protests Not Available